What happens on the day of a Full Structural Survey?

On the day that the Full Structural Survey is carried out the Chartered Surveyor will arrive at the property and spend approximately 4 hours (depending on the size of the property) carrying out a full inspection. All areas of the property are inspected including roofs and surveying equipment is used to check for dampness and thermal qualities of the building. You will be able to meet with the Surveyor to talk about any concerns or plans you have for the property.

During the survey the Building Surveyor will identify if alterations have been made such as removal of internal walls, damage to timbers – for example in the roof space roof timbers are inspected for any issues, evidence of subsidence and highlight any evidence of damp and associated issues.